CHRONOLIA HIGH EARLY
STRENGTH CONCRETE
Why Chronolia?
Time Savings and Increased Worksite Speeds
Regain time lost to weather, breakdowns, and other unpredicted circumstances by way of accelerated concrete mixes.
Ease of Placement
Quick stripping times and faster loading of structural elements, utilizing formwork rotations otherwise not possible.
Flexible Construction Schedules
Design project schedules using Chronolia® to speed up each phase of construction to save vital time and money upfront.
Applications
- Ideal for wall construction (tilt-up), columns, and beams
- Perfect for flatwork applications when fast-track construction is essential
- A preferred choice for civil engineering projects demanding quick turnaround times
- Large-scale projects with intensive construction schedules, such as mining headframes, hydro dams, roadways, and bridges.